2001' CONSTRUCTION RECORDS
no Construction Period Volume Contract Content
Seoul Subway construction
Center Mapo Station Submersion-preventing facility
2001.07.11 1 L/S Samdaeyang Development Co.,Ltd. Seoul Subway
6-3 section
Steps against Submersion (Water-blocking) Seoul Subway Line no.9 2001.07.30 1 L/S Saman Construction Co.,Ltd. 907 Terminal
Steps against Submersion (Water-blocking) Seoul Subway Line no.9 2001.07.30 1 L/S Saman Construction Co.,Ltd. 908 Terminal
Planning for Korea Highspeed Railway “Cheongan station”
(Water-blocking)
2001.07.30 1 L/S Halla Construction Co.,Ltd. Cheonan station of High speed railway
Seoul Outer highway Repair construction for Emergent Fireproof construction 2001.09.27 1 L/S Samhwan Co.,Ltd. Siheung Office, Korea Railroad Corp.
Water-blocking facility in Express bus terminal station 2001.10. 2 SET Korea Railway Corp. Korea Railway Corp.
Yeongdong ExpresswayJinbu Tunnel Repair construction for emergent fireproof door 2001.10.29 2 SET Doosan Construction Co.,Ltd. Yeongdong Expressway
Jinbu Tunnel
Ventilation repair construction 2001.10.29 1 L/S Samdaeyang Development Co.,Ltd. Seoul Subway 6-4
Blast proof Doors Construction (7.5psi) 2001.11.20 3 SET Samyoung Construction S-oil
Control Building