no | Construction | Period | Volume | Contract | Content |
---|---|---|---|---|---|
Central museum in
Won buddhism |
2002.01.02 | 1 SET | Yesung Adcom Co.,Ltd. | Furracks | |
Card sale price | 2002.01.01
~ 2002.03.31 |
1 L/S | Card sale price | ||
Mok-dong underground public sidewalk permanence Water tight door construction | 2002.04.09
~ 2002.06.30 |
1 SET | Dong-a Geological Co | Water tight Door
(Over-Head Type) |
|
Titanium Doors
construction |
2002.04.10 | 2 SET | Shin-woo industry | Titanium Door | |
Steel Door construction | 2002.05.10
~ 2002.05.28 |
1 SET | Shin-woo industry | Steel Door | |
Repar Blast Sliding Doors At BLDG 765 | 2002.04.11
~ 2002.06.11 |
2 SET | USACCK KUNSAN Office | US No.8 Base Camp.
Maintenance Construction |
|
Inch'on airport Freight terminal
“C“Treasure warehouse Entrance and Exit door shift construction |
2002.05.10
~ 2002.06.10 |
1 SET | Korean
Airport Co., Ltd. |
Treasure warehouse
Security door construction . |
|
Door Parts construction | 2002.06.15
~ 2002.06.28 |
1 L/S | Tea-gun precision | Door Parts | |
Oh-mok bridge Subway station temporary Water protection door wall construction | 2002.05.11
~ 2002.05.15 |
1 L/S | Dong-a Geological .Co | Steel-frame
structure type |
|
Permanence Water protection door construction Manual operation system construction | 2002.06.15
~ 2002.06.30 |
1 SET | Dong-a Geological .Co | Screw Gear Type | |
Card sale price | 2002.04.01
~ 2002.06.30 |
1 L/S | Card sale price | ||
Hardware | 2002.08.16 | 3 SET | You-chang Metal Co | ||
Treasure room Complement door construction | 2002.09.04
~ 2002.10.28 |
1 L/S | Cho-sun fireproof Co | ||
Protection Against poison room construction | 2002.09.06
~ 2002.10.06 |
1 L/S | Ministry of National Defense
Armed Forces Medical School |
CBRN Shelter System | |
City Development
Construction Dobong.Mt Water protection countermeasure facility |
2002.10.07
~ 2002.10.19 |
1 L/S | City
development Corporation |
Water tight door | |
Blast Proof Doors
Blast pressure : 60 psi |
2002.10.22
~ 2002.12.20 |
6 SET | S.R. ASHOK &
ASSOCIATES |
India Army | |
Radiation Shield Structure | 2002.10.24
~ 2002.12.20 |
2 SET | Seyoung NDC Co.,Ltd. | Yeonggwang 1&2 Nuclear Power plant | |
Blast Proof Doors
Blast pressure : 100,130 psi |
2002.10.22
~ 2002.12.20 |
4 SET | S.R. ASHOK &
ASSOCIATES |
India Army | |
Bullet Resistent Window
UL 752 |
2002.11.10
~ 2002.12.20 |
24 SET | Jawoon
Construction Co.,Ltd. |
503 Army in Korea | |
Ventilation Fan ect.
Repair |
2002.11.15
~ 2002.12.24 |
1 L/S | Jawoon
Construction Co.,Ltd. |
501 & 503 Army in Korea |