no | Construction | Period | Volume | Contract | Content |
---|---|---|---|---|---|
Blast door Frame Seal Gaskets | 2010.02.22 | 130 MTR | Middle East Oil Refinery(MEOR) | Egyptain Project Operation & Maintenance(EPROM) In Alexandria, Egypt | |
Water Tight Doors | 2010.02.24 | 4 SETS | SONGWON ENGINEERING CO,.LTD. | Project of Creating a Admiral Yi Sun-shin Park | |
Blast Proof Doors | 2010.03.25 | 7 SETS | DEAGOOKCONSTRUCTION CO.,LTD. | Hyundai Oil Bank EPC Construction Work | |
Tunnel Emergent Sliding Fire Rate Doors | 2010.07.05 | 4 SETS | DAECHEONGENGINEERING CO,.LTD. | Geoje-si National Highway Tunnel Emergent Door | |
Blast Resistant Windows | 2010.08.03 | 5 SETS | HYUNDAI CONSTRUCTION CO.,LTD. | QATAR SITE | |
PDC Pacific BoraSliding Doors | 2010.08.25 | 1 SET | KHAN CO,.LTD. | PDC Pacific Bora (Marine Part) | |
Blast Proof Shelter(8 PSI) | 2010.09.10 | 1 SET | GS CALTEX CO,.LTD. | Blast Proof Shelter(8 PSI) | |
Blast Proof Doors
Technology Consultant |
2010.10.07 | 1L/S | YEMEN LNG CO,.LTD. | ITR Room Door | |
3HR-UL Fire Doors | 2010.11.15 | 10 SETS | THE 3 STEEL CO.,LTD. | Merck Korea | |
Gas Tight & Ballistic Door | 2010.11.16 | 1 SET | ILJIN CON CO.,LTD. | ADD | |
Sliding Door | 2010.11.23 | 1 SET | GESUNG INDST CO.,LTD. | ||
Ballistic & Blast doors 40 psi/70 psi , UL752 Level 8 | 2010.11.30 | 8 SETS | MARCO POLO HINDUKUSH CON CO. | HQ ISAF PROJECT In Kabul, Afghanistan | |
Ballistic & Blast Window 40 psi psi , UL752 Level 8 | 2010.11.30 | 1 SET | MARCO POLO HINDUKUSH CON CO. | HQ ISAF PROJECT In Kabul, Afghanistan | |
3HR-UL Fire Doors | 2010.11.30 | 17 SETS | THE 3 STEEL CO.,LTD. | Merck Korea | |
Blast Proof Doors | 2010.12.20 | 2 SETS | BUMYUNG PLANT CO.,LTD. |