2006' CONSTRUCTION RECORDS
no Construction Period Volume Contract Content
Hor. Sliding Blast Door
Blast pressure : 3 bar
2006.02.09 1 SET S.R ASHOK
&ASSOCIATES
India Army
UL Fire Door(3Hr) 2006.03.10 1 SET UNSUNG E.N.C UNSUNG
Bullet Resistant Door 2006.03.25 1 SET EMBASSY OF THE REPUBLIC OF HUNGARY Hungary
Supervision for Installation of Blast Doors 2006.04.06
~
2006.04.13
 1 Person ALARKO ALSIM Sakhalin II –Phase2-LNG
In Russia
Watertight door (2.3 bar) 2006.06.17 22SET MMC-GAMUDA Malaysia(SMART)
Supervision for Installation of Watertight Doors 2006.06.28
~
2006.07.28
 1 Person MMC-GAMUDA Malaysia(SMART)
Blast proof door
Blast pressure : 3 bar
2006.06.30 1 SET 세지공영 LG대산유화방폭문
 Fire Blast proof door
Blast pressure : 12.5 psi
2006.07.18 2 SET 삼성엔지니어링(주) 멕시코현장
Sound proof door 2006.07.26 1 SET (주)롯데 방음문
Blast proof door
Blast pressure : 5 bar
2006.08.17 8SET Stahl Tecniks.Pvt.Ltd. India/first
Blast proof door
Blast pressure : 5 bar
2006.08.24 16
SET
Stahl Tecniks.Pvt.Ltd. India/ second
Blast proof door
Blast pressure : 5 bar
2006.08.27 16 SET Stahl Tecniks.Pvt.Ltd. India/third
Blast proof door
Blast pressure :15 & 30 kPa
2006.08.28 1 L/S ALSIM-ALARKO Sakhalin II in Russian
Blast proof door
Blast pressure : 25.4 psi
2006.08.28 6 SET IL SOK
CONSTRUCTION  CO.,LTD.
S-OIL
CBR Facilities Design 2006.12.21 1800 area SK Resien Germany(RUG-4)