no | Construction | Period | Volume | Contract | Content |
---|---|---|---|---|---|
Hor. Sliding Blast Door
Blast pressure : 3 bar |
2006.02.09 | 1 SET | S.R ASHOK
&ASSOCIATES |
India Army | |
UL Fire Door(3Hr) | 2006.03.10 | 1 SET | UNSUNG E.N.C | UNSUNG | |
Bullet Resistant Door | 2006.03.25 | 1 SET | EMBASSY OF THE REPUBLIC OF HUNGARY | Hungary | |
Supervision for Installation of Blast Doors | 2006.04.06
~ 2006.04.13 |
1 Person | ALARKO ALSIM | Sakhalin II –Phase2-LNG
In Russia |
|
Watertight door (2.3 bar) | 2006.06.17 | 22SET | MMC-GAMUDA | Malaysia(SMART) | |
Supervision for Installation of Watertight Doors | 2006.06.28
~ 2006.07.28 |
1 Person | MMC-GAMUDA | Malaysia(SMART) | |
Blast proof door
Blast pressure : 3 bar |
2006.06.30 | 1 SET | 세지공영 | LG대산유화방폭문 | |
Fire Blast proof door
Blast pressure : 12.5 psi |
2006.07.18 | 2 SET | 삼성엔지니어링(주) | 멕시코현장 | |
Sound proof door | 2006.07.26 | 1 SET | (주)롯데 | 방음문 | |
Blast proof door
Blast pressure : 5 bar |
2006.08.17 | 8SET | Stahl Tecniks.Pvt.Ltd. | India/first | |
Blast proof door
Blast pressure : 5 bar |
2006.08.24 | 16
SET |
Stahl Tecniks.Pvt.Ltd. | India/ second | |
Blast proof door
Blast pressure : 5 bar |
2006.08.27 | 16 SET | Stahl Tecniks.Pvt.Ltd. | India/third | |
Blast proof door
Blast pressure :15 & 30 kPa |
2006.08.28 | 1 L/S | ALSIM-ALARKO | Sakhalin II in Russian | |
Blast proof door
Blast pressure : 25.4 psi |
2006.08.28 | 6 SET | IL SOK
CONSTRUCTION CO.,LTD. |
S-OIL | |
CBR Facilities Design | 2006.12.21 | 1800 area | SK Resien | Germany(RUG-4) |