특수문

SAMHOON Mainly Works for CBRN Facilities, Special Doors And E.M.P Facilities

특수문

방폭문 소개 및 적용

  • HOME
  • 특수문
  • 방폭문
Overview & Application
· Ref. Document

-ACI 318-99/02/05
-ASCE 9th : Blast Resistant Design of Buildings
-TM5-1300 : Structures to Resist Effects of Accidental Explosions
-TM5 855-1 : Fundaments of Protective Design for Conventional Weapons
-TM5 858-1 : Design Facilities to Resist Nuclear Weapon Effects ; Facilities System Engineering
-TM5 858-2 : Design Facilities to Resist Nuclear Weapon Effects
-TM5 858-3 : Design Facilities to Resist Nuclear Weapon Effects ; Structures
-TM5 858-5 : Design Facilities to Resist Nuclear Weapon Effects ; Air Entrainment, Fasteners, etc
-TM5 858-6 : Design Facilities to Resist Nuclear Weapon Effects ; Hardness Verification
-TM5 858-7 : Design Facilities to Resist Nuclear Weapon Effects ; Facility Support Systems
-TM5 858-8 : Design Facilities to Resist Nuclear Weapon Effects ; Illustrative Examples

· Drawings, Data and Procedures

a. Certification of Design Report
b. Quality assurance and quality control program
c. Erection information
d. Detail shop drawings
e. Manufacturer's Specifications
f. Shop welding methods and procedure

g. Air Tight Test procedure
h. Post weld heat treatment procedure
i. Certified Material Test Report(CMTR)
j. Non-destructive examination procedure
k. Spare parts list
l. Handling, storage instruction

ARMY Part
· Blast Sliding Door (U.S.ARMY Kunsan Airport 8th Fleet of USFK)
  • Blast Proof Door
    ( India project )
  • Magazine Project
    (100bar)
  • NCD MCR Entrance
  • EMBEDD PLATE
· PROJECT B-FM PHASE CUSTOM BLAST SWING TYPE ACTING DOOR (363 PSI)
  • BLAST VERTICAL ACTING DOOR(363 PSI)
  • Blast Proof Shelter Sliding Door(30 Bar)
  • Blast Proof Shelter Sliding Door(30 Bar)
· Blast & Gas Tight Door(8.0 bar/ASTM E 283)/ SEONGNAM CITY HALL CBRNe Facilities
Nuclear Power Plant
  • Steel type Blast & Air Leakage Door
  • Steel type Blast & Air Leakage Door
  • 월성 원자력 발전소 (삼중수소제거실 방폭 및 기밀문)
  • 방폭문 성능평가 시험 한국기계연구원-ANSI N510
  • 방폭문 성능평가 시험 한국기계연구원-ANSI N510
  • 방폭문 설치
    울진원자력 발전소 3 & 4호기
  • Steel Type Blast Door(3Bar)
    94-5951
    육상시설 화생방 처리실
  • 콘크리트 형식 방폭문
  • Concrete Type Blast Door (3Bar)
    대전시청사 화생방시설
OIL, LNG Part
  • Blast Proof Door 30kpa
    (SAKHALIN II PROJECT PHASE2-LNG PLANT)
  • Blast Proof Door
    ( India project )
  • Hyundai Oilbank PCD Entrance
    Auto/Manual Type Blast Door(3Bar)
  • S-OIL(Onsan Factory)
    NHC Blast Door (7.8psi)
  • Blast Window
    2.02 psi pressure & 1 hr Fire rate
  • 방화 및 방폭도어
    (2hr fire-rate)
    (쿠웨이트오일)
  • RESTRAINING HINGE/KRCC YOSU PLANT/BLAST LOAD 7.5 PSI
  • BLAST PROOF(13PSI, IMPULSE OF 1,100PSI-MS)
  • 3HR FIRE RATE DOOR
  • ARZEW REFINERY REHABILITATION AND ADAPTATION PROJECT (ARZEW)
  • Blast Resistant and Gas Tight Doors(1.0 BAR)
· YEMEN LNG(YLNG) BLAST PROOF & GAS TIGHT DOORS(1.75 BAR)
· YLNG UPSTREAM PROJECT- PHASE II, Blast Resistant and 2hr Fire Rate Doors and Windows(4.5 PSI)
· HQ ISAF PROJECT/ Kabul, Afghanistan Blast & Bullet Resistant Door and Windows(30 kPa/AK 47)