HOME
|
WEBMAIL
Kor
Eng
Chi
Ara
Company Info
Greetings
Corporate Precepts
History
Certificate
Industrial Property
Nuclaer Power Plants
Technological
Acoomplishment
Rocation
CBRNe Facilities
NBC Facilities
Multi Cable Transit
Shelter System
Blast Valve(3 Bar)
NBC Filter
NBC MASK
CBRNe Facilities Reference Document
CBRNe Facilities Presentation Docoument
Vehicle that equipped NBC filter for Anti-Terrorism
Thermal Sight
Greetings
Product
Catalog
User Manual
Special Doors
Bullet Resistant Door
Bullet Resistant Windows
Blast Door
Water Tight Door
Gas Tight Door
Radiation shield Door
Fire Door
Hatch sheld Door
Roof hatch Doors
Big Door & Wire Mesh Door
Air Lock Door
Security / Vault Door
Hardware
Etc
Mobile Hospital Emergency Unit
9 Bed Mobile Trailer Emergency Unit
72 bed trailer mobile hospital
Video
Dataroom
Catalog
Quality Data
Technical Data
Product Price Listing
Reference Process Diagram
Customer Support
Notice
Q&A
Press
SPECIAL DOORS
SAMHOON Mainly Works for CBRN Facilities, Special Doors And Thermal Sight
SPECIAL DOORS
Bullet Resistant Door
Overview & Application
Reference of Bullet Resistant Door
Bullet Resistant Windows
Blast Door
Overview & Application
Certificate & Missile Resisting
Conditions
Reference of Blast Door
BLAST TEST FOR SLIDING DOOR (40 BAR)
Swing Door Type Blast Test(69kPa)
Analysis & Calculations for Blast Door
How to Make Ultra High Performance Concrete
Analysis of Bunker Buster GBU-57
ASTM E 283 Test
ASTM E 330 Test
ASTM F 2247 Test
UFC 4-010-01 DoD Minimum
PROPOSAL BLAST CELL
Approved Document
Water Tight Door
Overview & Application
Certificate
Characteristics & Practicals
Projects
Analysis of the Flood Impact by Haeundae Songjeong-gu Tide Level (Storm Surge Wave Level) according to the Natural Disaster Countermeasures Act 12
Gas Tight Door
Radiation shield Door
Fire Door
Stainless Steel Fire Door
Stainless Steel Air Tight Door
Fire Door/Fire Insurers
Laboratories of Korea
Acoustic Door
Windload system Calculation
Hatch sheld Door
Roof hatch Doors
Big Door & Wire Mesh Door
Air Lock Door
Security / Vault Door
Security Door
Hardware
Etc
Fire Door/Fire Insurers Laboratories of Korea
HOME
Special Doors
Fire Door
Approved Document
4025 APPROVAL DOCUMENTS FOR FIRE RATE DOOR (CHINHAE NAVAL BASE)
FED(QAB) Steel Door 4025 Approval Document
Fire Rating Door PMC Approval Document
Samcheok-City, Public Sewage Disposal Plant
Test Report
FILK Test Report
Test Report for Smoke Laekage(Yeong-Gwang Nuclear Power Plant). ASTM E 283
Field Test Report(전라-여수간 철도용 피난연락갱 비상방화문)
Reference View
Reference Drawing for Fire rate Door
Fire Door / 3hr Rate (Fire Insurers Laboratories of Korea)
Exposed face
of the specimen before fire test
Exposed face
of the specimen after fire test
Unexposed face
of the specimen before fire test
Unexposed face
of the specimen after fire test
The specimen before
hose strem test
The specimen after
hose strem test
EXXON MOBIL SAKHALIN-I PROJECT (Fire rate 1 ½ hr)
EXXON MOBIL SAKHALIN-I PROJECT s(Fire rate 1 ½ hr)
NIGERIA EGP 3 PROJECT
(Fire rate 1 ½ hr)
NIGERIA EGP 3 PROJECT
(Fire rate 1 ½ hr)
Type of Fire door
Type of Fire door
Type of Fire door
Type of Fire door